Every other community in Dubai has house types. Emirates Hills does not , each plot was built to its owner’s own architect, so nothing here repeats. That rules out estimating from a floor plan, and it changes how the work is priced, scheduled and finished.
Three things about work in this community
There is no standard anything
No repeating window sizes, no known ceiling heights, no drawing we have seen before. Where we can quote a Dubai Hills villa from its type, here every measurement is taken from scratch and every track is specified for that opening alone.
The drops are the longest we handle
Entrance halls and stair voids in these houses run well past four metres and sometimes past six. At that length fabric is being engineered rather than hung, the panel is railroaded or seamed, the track is rated for the hanging weight, and the hem is weighted so the fall stays true over the full drop. It also needs proper access equipment, which we bring.
Often we are not working for the homeowner
Most of what we do here reaches us through an interior designer, an architect or a project manager, and arrives as a specification rather than a question. We are comfortable in that position: we produce to the schedule we are given, we flag anything that will not perform, and we do not go around the designer to the client.
Why a specified fabric takes weeks, not days
Everywhere else on this site we quote three to five working days. That number does not apply here, and it is worth explaining why before it becomes a surprise.
A specified fabric is usually not something we hold. It is ordered from the mill, and the mill has its own cutting schedule, its own dye lots and its own shipping. Nothing about that is unusual in bespoke work , it is simply a different clock.
| Timeline | A Typical Run |
|---|---|
| Week 1 | Consultation, full measure, specification confirmed against the designer's schedule |
| Weeks 2–8 | Fabric ordered and shipped. Lead time depends on the mill and the dye lot, and we confirm it in writing before you commit |
| Weeks 8–10 | Cutting, hand finishing, hems weighted, headings made up in our workshop |
| Week 10+ | Track installed, panels hung, dressed and left to settle, then a return visit to adjust the fall |
Work in this community








What these houses usually need
| Space | Specification | Why |
|---|---|---|
| Entrance hall or stair void | Railroaded panel, rated track, motorised | Beyond reach and beyond a single roll width |
| Formal reception | Silk or heavy weave, hand-finished heading, pelmet | The room is the statement and the finishing shows |
| Majlis | Velvet or dense linen, full coverage, trimmed | Guest-facing, and privacy is absolute |
| Master suite | Layered sheer and blackout on a concealed track | Sleep, with the hardware out of sight |
| Garden and pool frontage | Sheer at full height | Long open elevations, no overlooking |
| Staff and service areas | Simple lined pairs, hard-wearing | Function, quietly specified, still properly made |
How the cost is built
| Curtains Type | Minimum Price (AED) | Maximum Price (AED) |
|---|---|---|
| Blackout Curtains | 65/sqm | 120/sqm |
| Sheer Curtains | 45/sqm | 95/sqm |
| Soundproof Curtains (3-Layer) | 130/sqm | 160/sqm |
| Soundproof Curtains (5-Layer) | 170/sqm | 210/sqm |
| Motorized Curtains | 65/sqm + AED 950 Motor Cost | 120/sqm + AED 950 Motor Cost |
| Balcony Curtains | 90/sqm | 130/sqm |
| Velvet Curtains | 55/sqm | 80/sqm |
| Wave Curtains | 60/sqm | 85/sqm |
Areas nearby
We work across the western villa communities. Nearby: Dubai Hills, Al Barsha, Dubai Marina. Consultation at your home or with your designer, at no charge.
Emirates Hills questions
We produce to the designer’s specification and report to them. If we think a fabric will not perform on a particular elevation we say so, in writing, to the designer. We do not go around them to the client.
Usually. Send the reference and we will confirm availability, price and lead time before you commit to it. If it cannot arrive within your programme we will tell you at that point, not later.
Plan on eight to twelve weeks where fabric is being imported. Where we can specify from stock it is considerably faster. The variable is almost always the mill, not the workshop.
Yes, and it is routine here. The panel is railroaded or seamed, the track is rated for the load, the hem is weighted, and it is motorised because nobody is drawing that curtain by hand.
Understood, and it is common in this community. Nothing is photographed without written permission, and we do not name clients.
